# FIELD TRIAL LOG **Observation Protocol for Decision Model Validation** | | | |---|---| | **Version** | 1.0 | | **Status** | ACTIVE | | **Purpose** | Collect raw data from real customer cases | --- ## Log Entry Template | Field | Example | Notes | |-------|---------|-------| | **Date** | 2026-07-15 | | | **Customer Type** | Municipality / Property Owner / Contractor | | | **Decision** | Inspect Road A12 | What the system recommended | | **Decision Accepted** | Yes / No | Did the user accept? | | **Action Executed** | Yes / No / Pending | Was the action carried out? | | **Outcome** | Crack confirmed | What actually happened | | **Time to Decision** | 3 minutes | How long from login to decision | | **User Feedback** | "We trusted the recommendation." | Verbatim or summary | | **Confidence** | 87% | System confidence at decision time | | **Notes** | Free text | Anything else observed | --- ## Example Entries ### Entry 1 | Field | Value | |-------|-------| | Date | 2026-07-15 | | Customer Type | Municipality | | Decision | Inspect Road A12 | | Decision Accepted | Yes | | Action Executed | Yes | | Outcome | Crack confirmed, repaired within 14 days | | Time to Decision | 3 minutes | | User Feedback | "We trusted the recommendation." | | Confidence | 87% | | Notes | User clicked through Explainability chain | ### Entry 2 | Field | Value | |-------|-------| | Date | 2026-07-16 | | Customer Type | Property Owner | | Decision | Repair facade immediately | | Decision Accepted | No | | Action Executed | No | | Outcome | Deferred, user chose to wait | | Time to Decision | 5 minutes | | User Feedback | "Too expensive right now." | | Confidence | 92% | | Notes | Confidence was high but user rejected due to cost | --- ## Questions This Log Answers After collecting entries: - Were recommendations accepted? (Decision Adoption Rate) - Were actions executed? (Execution Rate) - Did outcomes match predictions? (Decision Accuracy) - Was confidence reasonable? (Calibration) - Which recommendations were ignored? (Rejection Analysis) - How long did decisions take? (Time to Decision) --- ## Future KPIs ### Decision Adoption Rate ``` Recommendations accepted ──────────────────────── Total recommendations ``` Example: 72 of 100 = **72%** ### Decision Accuracy ``` Decisions that proved correct ───────────────────────────── Total decisions ``` Example: 65 of 72 executed = **90%** **Note:** These require months of data. Start collecting now, calculate later. --- ## Pilot Structure **Four phases — product research, not marketing:** | Phase | What You Do | What You Learn | |-------|-------------|----------------| | **1. Collection** | Film, photograph, create observations | What can actually be detected? | | **2. Analysis** | Let pipeline create Findings and Decisions | Are decisions understandable and relevant? | | **3. Verification** | Compare with reality on site | Was the recommendation correct? | | **4. Reflection** | Document what worked and what didn't | What needs to change in the model? | **Full chain captured:** ``` Reality → Observation → Evidence → Finding → Decision → Action → Outcome → Learning ``` ## What to Measure **Not:** Did AI find a crack? **But:** Did this become a decision a real person could act on? **Example:** - AI finds 23 cracks - LandveX says: "Inspect Road A12 within 30 days" - **The second is the product.** ## Document "Non-Decisions" Also valuable: - "No action needed" - "More data required" - "Cannot recommend anything yet" If the system always tries to give advice even when evidence is weak, you risk building a system that feels confident when it shouldn't. ## Film the Workflow Since you are conducting the pilots, film more than just infrastructure. Also film: - How you find an area - Why you choose a mission - How you document - How long it takes - What feels unclear - When you become uncertain - When the system saves time This material becomes invaluable for product development, onboarding, training, and sales. ## Observer Mindset **Principle:** If data contradicts the model, the model should change. Use the same approach during pilots. If you notice: - A step feels unnecessary - A decision becomes unclear - A recommendation cannot be acted on **Document first, change model later.** Build the model from real workflows instead of assumptions. **The first 20–50 real missions will give you more valuable product knowledge than months of additional modeling.** ## Status **ACTIVE — Awaiting first customer case** --- ## ändringshistoria | Version | Datum | Beskrivning | |---------|-------|-------------| | 1.0 | 2026-07-02 | Initial field trial log template | | 1.1 | 2026-07-02 | Added pilot phases, measurement principles, filming protocol |