# DECISION MODEL v1.0 — MANUAL REVIEW **Validation of 8 Scenarios Against Decision Object Structure** | | | |---|---| | **Version** | 1.0 | | **Date** | 2026-07-02 | | **Reviewer** | AI Agent | | **Rule** | No changes to model during review | --- ## Review Protocol For each scenario, answer: | # | Control | Question | Result | |---|---------|----------|--------| | 1 | **Decision** | Is this a real decision, not just an observation? | Yes / No | | 2 | **Verb** | Can the decision be expressed as a verb? | Yes / No | | 3 | **Information** | Is more information needed before deciding? | Yes / No | | 4 | **Decision Object** | Are all 7 fields used? | List unused | | 5 | **Missing Fields** | Is anything missing? | List missing | | 6 | **Explainability** | Can the chain Reality → Observation → Evidence → Finding → Decision be followed? | Yes / No | | 7 | **Domain Object** | Does the Decision Object reference at least one concrete domain object? | Yes / No | | 8 | **Outcome** | Pass / Observation / Fail | | --- ## Scenario 1: Road Crack (Maintenance) | # | Control | Result | Notes | |---|---------|--------|-------| | 1 | Decision | ✅ Yes | "Prioritize inspection" is a decision | | 2 | Verb | ✅ Yes | "Inspect" | | 3 | Information | ✅ No | All needed info present | | 4 | Decision Object | ✅ All used | Decision, Why, Evidence, Confidence, Consequence, Action, Business Impact | | 5 | Missing Fields | ✅ None | | | 6 | Explainability | ✅ Yes | Photo → crack detected → 3 observations → degraded 15% → inspect | | 7 | Domain Object | ✅ Yes | "Road 1132" | | 8 | **Outcome** | **✅ PASS** | | --- ## Scenario 2: Damaged Facade (Safety) | # | Control | Result | Notes | |---|---------|--------|-------| | 1 | Decision | ✅ Yes | "Immediate safety inspection" is a decision | | 2 | Verb | ✅ Yes | "Inspect" (urgent) | | 3 | Information | ✅ No | All needed info present | | 4 | Decision Object | ✅ All used | All 7 fields | | 5 | Missing Fields | ✅ None | | | 6 | Explainability | ✅ Yes | Drone video → panel loose → weather data → integrity compromised → immediate inspection | | 7 | Domain Object | ✅ Yes | "Building A7" | | 8 | **Outcome** | **✅ PASS** | | --- ## Scenario 3: Broken Road Sign (Compliance) | # | Control | Result | Notes | |---|---------|--------|-------| | 1 | Decision | ✅ Yes | "Replace sign" is a decision | | 2 | Verb | ✅ Yes | "Replace" | | 3 | Information | ✅ No | All needed info present | | 4 | Decision Object | ✅ All used | All 7 fields | | 5 | Missing Fields | ✅ None | | | 6 | Explainability | ✅ Yes | Photo → sign damaged → traffic data → control compromised → replace | | 7 | Domain Object | ✅ Yes | "Intersection X" | | 8 | **Outcome** | **✅ PASS** | | --- ## Scenario 4: Vegetation Blocking Sight (Risk Reduction) | # | Control | Result | Notes | |---|---------|--------|-------| | 1 | Decision | ✅ Yes | "Schedule vegetation removal" is a decision | | 2 | Verb | ✅ Yes | "Remove" | | 3 | Information | ✅ No | All needed info present | | 4 | Decision Object | ✅ All used | All 7 fields | | 5 | Missing Fields | ✅ None | | | 6 | Explainability | ✅ Yes | Photos → vegetation high → growth trend → degradation → schedule removal | | 7 | Domain Object | ✅ Yes | "Intersection Y" | | 8 | **Outcome** | **✅ PASS** | | --- ## Scenario 5: Parking Area Wear (Investment Priority) | # | Control | Result | Notes | |---|---------|--------|-------| | 1 | Decision | ✅ Yes | "Include in budget" is a decision | | 2 | Verb | ✅ Yes | "Include" / "Budget" | | 3 | Information | ⚠️ Observation | May need cost estimate for full decision | | 4 | Decision Object | ✅ All used | All 7 fields | | 5 | Missing Fields | ⚠️ Observation | "Cost estimate" could strengthen decision | | 6 | Explainability | ✅ Yes | Photos → wear → usage data → need resurfacing → budget | | 7 | Domain Object | ✅ Yes | "Parking Area Z" | | 8 | **Outcome** | **⚠️ OBSERVATION** | Decision valid but could be strengthened with cost estimate | --- ## Scenario 6: Cosmetic Scratch (No Action) | # | Control | Result | Notes | |---|---------|--------|-------| | 1 | Decision | ✅ Yes | "No action, continue monitoring" is a conscious decision | | 2 | Verb | ✅ Yes | "Monitor" | | 3 | Information | ✅ No | All needed info present | | 4 | Decision Object | ✅ All used | All 7 fields | | 5 | Missing Fields | ✅ None | | | 6 | Explainability | ✅ Yes | Photo → scratches → no functional impact → normal wear → monitor | | 7 | Domain Object | ✅ Yes | "Sign S15" | | 8 | **Outcome** | **✅ PASS** | | --- ## Scenario 7: Mixed Evidence Sources (Complex) | # | Control | Result | Notes | |---|---------|--------|-------| | 1 | Decision | ✅ Yes | "Inspect drainage, prioritize if recurs" is a decision | | 2 | Verb | ✅ Yes | "Inspect" / "Prioritize" | | 3 | Information | ✅ No | All needed info present | | 4 | Decision Object | ✅ All used | All 7 fields | | 5 | Missing Fields | ✅ None | | | 6 | Explainability | ✅ Yes | Photo + sensor + weather → pooling → historical data → drainage inadequate → inspect | | 7 | Domain Object | ✅ Yes | "Road Segment R42" | | 8 | **Outcome** | **✅ PASS** | | --- ## Scenario 8: Insufficient Evidence (No Recommendation) | # | Control | Result | Notes | |---|---------|--------|-------| | 1 | Decision | ⚠️ Observation | "No recommendation yet" is not a decision, it's a deferral | | 2 | Verb | ⚠️ Observation | "Collect" is an action, not a final decision | | 3 | Information | ✅ Yes | More data needed | | 4 | Decision Object | ⚠️ Observation | "Consequence" and "Business Impact" are weak | | 5 | Missing Fields | ⚠️ Observation | "Confidence" is low by definition — could be explicit | | 6 | Explainability | ✅ Yes | Blurry photo → unclear → conflicting AI → inconclusive | | 7 | Domain Object | ⚠️ Observation | Location unclear due to low GPS precision | | 8 | **Outcome** | **⚠️ OBSERVATION** | Valid outcome but not a decision — model handles it correctly | --- ## Review Summary | Metric | Count | |--------|-------| | **Total Scenarios** | 8 | | **Pass** | 6 | | **Observation** | 2 | | **Fail** | 0 | ### Recurring Unused Fields None. All 7 fields used across all scenarios. ### Recurring Missing Fields - **Cost estimate** (Scenario 5) — could strengthen investment decisions - **Explicit low confidence** (Scenario 8) — could clarify insufficient evidence ### Recurring Unclear Verbs None. All decisions expressible as verbs. ### Domain Object References | Scenario | Domain Object | Status | |----------|--------------|--------| | 1 | Road 1132 | ✅ | | 2 | Building A7 | ✅ | | 3 | Intersection X | ✅ | | 4 | Intersection Y | ✅ | | 5 | Parking Area Z | ✅ | | 6 | Sign S15 | ✅ | | 7 | Road Segment R42 | ✅ | | 8 | (unclear GPS) | ⚠️ | --- ## Conclusion **Recommendation: READY FOR INVARIANCE TEST** The Decision Object structure handles all 8 scenarios without modification. Two scenarios generate observations (not failures) — the model correctly handles "insufficient evidence" and "needs more data" cases. **No changes needed to Decision Model v1.0.** --- ## Next Steps 1. ✅ Manual Review — COMPLETE 2. ⏳ Decision Invariance Test — Ready to run 3. ⏳ Evidence Variation Test — Ready to run 4. ⏳ Empirical validation with real data — Pending --- ## ändringshistoria | Version | Datum | Beskrivning | |---------|-------|-------------| | 1.0 | 2026-07-02 | Manual review of 8 scenarios — 6 pass, 2 observation, 0 fail | --- ## STATUS **REVIEW COMPLETE — READY FOR INVARIANCE TEST**